Recorded at 7:30 a.m. on March 24, traffic situation at An Thai bridge km13+250 national highway 17B was basically smooth, no longer congested.
Traffic at An Thai bridge is no longer congested.
Receiving feedback from Hai Duong newspaper,from 18.3 to present, SBTECH Joint Stock Company - An Thai bridge repair contractoradded, arranged 4 more peopleto guard and direct traffic at both ends of the bridge, bringing the total number of guards and guides here to 8 people.The contractor has now completed re-paved the bridge surface with asphalt concrete on the half of An Thai bridge in the direction of Long Xuyen ward (Kinh Mon) to National Highway 5. During rush hour, motorbikes are allowed to enter this newly paved car lane to avoid congestion.
Cars going in this direction must go to the opposite lane, which is regulated by traffic guides from both ends of the bridge (with walkie-talkies). Cars will be allowed to move in about 10 minutes each way. Traffic congestion during rush hour has been resolved. A representative of BOT Road 188 Company Limited - the project investor - said that the repair of An Thai Bridge will be completed before April 30.
Traffic control at An Thai bridge from Long Xuyen ward (Kinh Mon) to National Highway 5
On March 15, Hai Duong electronic newspaper published readers' comments "Repairing An Thai bridge, traffic congestion"Reflecting that during the morning rush hour from 7-8am, when workers go to work, the traffic of motorbikes is very heavy, so many motorbike riders encroach on the car lane, leading to a traffic jam of hundreds of meters in the direction from Long Xuyen ward to National Highway 5.
SUCCESS