Agriculture - Rural areas

Phuong Hung A pumping station will stop operating

PV June 17, 2024 19:55

Hai Duong Provincial People's Committee agreed with the proposal of the Department of Agriculture and Rural Development to stop the operation of Phuong Hung A pumping station (Gia Loc) in the coming time.

z5092209250491_b9ff68733830c00c0f055fbee54e00fd.jpg
The remaining cultivated area in Dong Lo (Gia Loc town) will be supplied by Cau Cong Pumping Station (illustrative photo)

The reason for stopping the operation of Phuong Hung A pumping station is that the current area of ​​the field that this pumping station supplies irrigation water to is only 8.5 hectares in Dong Lo area (Gia Loc town). However, this area has also been planned for a new urban area in the south of Hai Duong city (sub-area 3).

Because the current water supply area is too small and will no longer exist in the future, the Department of Agriculture and Rural Development has developed a plan to transfer Cau Cong pumping station to Phuong Diem Agricultural Service Cooperative (Gia Loc town) to manage and temporarily supply irrigation water for this area.

Phuong Hung A pumping station was built in 1962 and includes 3 machines (2 machines 1,200 m3/hour and 1 machine 1,000 m3/hour), managed and exploited by the Provincial Irrigation Works Exploitation One Member Co., Ltd., with the initial design irrigation task of 284 hectares.

PV
(0) Comments
Latest News
Phuong Hung A pumping station will stop operating