Events through photos

Phong Chau pontoon bridge officially opened to traffic

TH (according to VNA) September 30, 2024 07:36

From 6:00 a.m. on September 30, the 249th Engineer Brigade officially opened the Phong Chau pontoon bridge connecting the two banks of the Red River in Tam Nong and Lam Thao districts (Phu Tho), serving immediate travel needs.

461006904_557365983623704_454071906283528866_n.jpg
Phong Chau pontoon bridge temporarily replaces the previously collapsed bridge
ttxvn_thong xe cau phao phong chau (2).jpg
The first vehicles crossed the bridge at 6:30 a.m. on September 30.
ttxvn_thong xe cau phao phong chau (1).jpg
Traffic flow across the bridge on the morning of September 30
ttxvn_thong xe cau phong chinh thuc (2).jpg
Pontoon bridges meet the travel needs of a large number of people.
ttxvn_thong xe cau phong chinh thuc (1).jpg
Traffic flow across the bridge after the opening order
ttxvn_chinh thuc thong xe cau phao phong chau (1).jpg
ttxvn_chinh thuc thong xe cau phao phong chau (3).jpg
ttxvn_chinh thuc thong xe cau phao phong chau (2).jpg
ttxvn_chinh thuc thong xe cau phao phong chau (6).jpg
ttxvn_chinh thuc thong xe cau phao phong chau (9).jpg
ttxvn_chinh thuc thong xe cau phao phong chau (10).jpg
ttxvn_cau phao phong chau.jpg
People and vehicles crowded across the pontoon bridge
TH (according to VNA)
(0) Comments
Latest News
Phong Chau pontoon bridge officially opened to traffic