Agriculture - Rural areas

Hai Duong simultaneously took water to flood the floodplain.

One and Only January 23, 2024 16:07

On the morning of January 23, Hai Duong Province Irrigation Works Exploitation One Member Co., Ltd. simultaneously operated pumping stations in districts, cities, and towns to pump floodwater to serve production.

tram-bom-ghe11.jpg
Cau Ghe pumping station in Tan Truong commune (Cam Giang) pumps water from the Bac Hung Hai system into the intra-field canal.

To make the most of the water from upstream, Hai Duong Province Irrigation Works Exploitation One Member Co., Ltd. directed its member enterprises to concentrate human resources, machinery and equipment to pump water into the fields. Strengthen inspection of water supply to the fields to ensure water conservation and prevent water shortages. Districts, cities and towns are requested to operate local pumping stations to pump water into the fields; at the same time, water is brought to the right place, and land is prepared to ensure the right time frame.

trom-bom-co-bi.jpg
Hai Duong Province Irrigation Works Exploitation One Member Co., Ltd. mobilizes human resources, machinery and equipment to pump water into the floodplain. In the photo: Inspection at Trinh Nu Pumping Station in Hong Khe Commune (Binh Giang)

As of January 23, Hai Duong Province Irrigation Works Exploitation One Member Co., Ltd. has flooded 19,461 hectares out of a total of 51,446 hectares of cultivated land, reaching 37.8%. Currently, Kinh Mon town has not flooded because there are still many areas of onions and garlic that have not been harvested. The company strives to flood 85-90% of the area within 8 days of the first water intake.

lam-dat11.jpg
Bring water to where, prepare the land there to ensure the right time frame.

Previously, hydroelectric reservoirs increased water discharge for localities to take water from 0:00 on January 23 to 24:00 on January 30. According to the assessment, the water source on the first day of water intake was of good quality, the water level in the Bac Hung Hai canal system was 25-30 cm higher than usual.

One and Only
(0) Comments
Latest News
Hai Duong simultaneously took water to flood the floodplain.